Workday: Thomas Point May 18, 2013
There was quick work day on May 18th out at Thomas Point. Volunteers installed braces on a noisy vent on the roof of one of the dormers. They sanded down the walls of the food closet in the kitchen and were finally able to patch one of the rotted lower rails on the main deck. They did quite a bit for two people!
Photo by Hobie Statzer
Henry installs brakets on vent
Photo by Hobie Statzer
Kitchen closet with paint removed and sanded.
Photo by Hobie Statzer
Section of rotted wood on lower railing ready to be patched.
Photo by Hobie Statzer
Patched railing
Volunteers:
Henry Gonzalez
Hobie Statzer
Permanent link to this article: https://cheslights.org/workday-thomas-point-may-18-2013/